ISTQB Quiz

Welcome to your ISTQB Quiz. This quiz consists 40 multiple-choice questions. There is no negative marking in this.

1. A student should score a minimum of 50 marks in order to clear the exam. Maximum marks can be scored is 100. Identify the valid equivalence values, if the student clears the exam
2. A text box which accepts alphanumeric values. Identify the valid equivalence class from the following options
3. Which of the following is true about White and Black Box Testing Technique
4. The main objective of acceptance testing is
5.

The difference between re-testing and regression testing is

6. Which of the following are non-functional testing methods?
i) System testing
ii) Performance testing
iii) Availability testing
7. Which of the following is a part of Test Closure Activities?
i. Checking which planned deliverables have been delivered
ii. Defect report analysis
iii. Finalizing and archiving testware
iv. Analyzing lessons
8. All the students who secured more than 50 marks go to Room A, All the students who secured more than 75 go to Room B, All the students who secured less than 50 go to Room C.
Identify the equivalence values which belong to the same class
9. Features of White Box Testing Technique are
i. We use explicit knowledge of the internal workings of the item being tested to select the test data
ii. Uses specific knowledge of programming code to examine outputs and assumes that the tester knows the path of logic in a unit or a program
iii. Checking for the performance of the application
iv. Checking the functionality of the application
10. Which of the following techniques is NOT a black box technique
11. Which of the following is not a white box technique?
12. Which of the following statements about Boundary value testing is true?
13. Which of the following is the task of a Test Lead
i. Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.
ii. Write Test Summary Reports based on the information gathered during testing
iii. Decide what should be automated, to what degree and how.
iv. Create the Test Specifications
14. Which of the following statement is not correct
15. A deviation from the specified or expected behaviour that is visible to end-users is called
16. Test Conditions are derived from
17. A text box which accepts numeric values in the range of 18 to 99. Which value from the following options fall in the invalid equivalence class
18. Regression testing should be performed
i. Every week
ii. After the software has changed
iii. As often as possible
iv. When the environment has changed
v. When the project manager says
19. A numeric field accepts values between 10 and 25 and reject values less than 10 and greater than or equal to 26. Which of the following input values cover all the equivalence partitions
20. Regression testing always involves
21. Acceptance test cases are based on
22. Which of the following uses Impact Analysis most
23. Alpha testing is
24. When should testing be stopped
25. An input field takes the range between 1000 to 9999 inclusive. Which of the following inputs might be a result of designing tests for only valid equivalence classes and valid boundaries
26. A common test technique during component test is
27. Which of the following statement is correct
28. Test cases are designed during
29. To make a test effective it is most important that
30.

Minimum Tests Required for Statement Coverage and Branch Coverage:


Read A
Read B
If A+B > 100
then Print “STM”
End if



If A > 50 then
Print “SoftwareTestingMaterial”
End if
31. Which of the following is not decided in the phase of a test plan?
32. How would you estimate the amount of re-testing likely to be required?
33.

As per the taxation, an empoyee has $6000 of salary tax-free and the next $1500 is taxed at 10% and the next $3000 after that is taxed at 12%. Any further amount is taxed at 20%.


To the nearest whole dollar, which of these groups of numbers fall into three different equivalence classes?
34. A numeric field accepts values between 10 and 25 and reject values less than 10 and greater than or equal to 26. Which of the following input values cover boundary values
35. Which of the following is not the integration strategy?
36. Which of the following is least important in test management?  
37. When to begin testing in the SDLC
38. Beta testing is
39. Which of the following is correct in terms of Statement Coverage
i. it will not check missing statements
ii. It will check dead code
iii. It will not check unused branches
iv. It will check unused statements
40. How much testing is enough?
i. This question is impossible to answer
ii. This question is easy to answer
iii. The answer depends on the risk for your industry, contract and special requirements
iv. This answer depends on the maturity of your developers
v. Answer depends on the development team

ISTQB Quiz – You can test your knowledge with this ISTQB Quiz. We have created this ISTQB Quiz Online Test to let you take an ISTQB Mock Test before taking ISTQB Certification Exam.

Knowledge Base:

ISTQB Quiz

Rajkumar SM is a founder of SoftwareTestingMaterial. He is a certified Software Test Engineer by profession and blogger & youtuber by choice. He has an extensive experience in the field of Software Testing. He writes here about Software Testing which includes both Manual and Automation Testing. He loves to be with his wife and cute little kid 'Freedom'.

Leave a Comment

Share via
Copy link
Powered by Social Snap